Request for Proposals: Gorham Industrial Park - West Campus
Bid Results
Below are the results as of 4pm, July 20, 2023 of the public bid opening of sealed bids submitted in response to the request for bids issued by Northland Enterprises LLC on behalf of the Town for the construction of the public roadway and associated infrastructure entering the new Gorham Industrial Park - West Campus:
- RJ Grondin and Sons: $4,990,888.00
- Shaw Brothers Construction, Inc.: $4,979,172.00
- Gorham Sand & Gravel: $5,895,000.00
RFB
On behalf of the Town of Gorham (Town), Northland Enterprises LLC (NLE) is issuing this request for bids (RFB) for the construction of the public roadway and associated infrastructure entering the new Gorham Industrial Park - West Campus. NLE is serving as a consultant to the Town during the bid period and contractor selection process for this RFB.
Sealed Bids addressed to Town of Gorham and endorsed on the wrapper “Bids for Gorham Industrial Park Road & Infrastructure Construction in the Town of Gorham” will be received from contractors at the Gorham Municipal Center, located at 75 South Street, Suite 1, Conference Room A, Gorham, Maine 04038, at 2pm EST on July 20, 2023, and publicly opened and read.
All bid documents are available via the Dropbox link below. A hard copy of all bid documents are also available for viewing only at the Gorham Municipal Center, 75 South Street, Gorham, Maine 04038.
Access to bid documents
Project Description
Pre-Bid Meeting
A pre-bid meeting is not currently scheduled or anticipated but, if requested by bidders, NLE and Town officials will schedule an on-site meeting prior to bids being due. Requests for Information
All Requests for Information (RFI’s) should be transmitted electronically in e-mail form only to Brad Fries (brad@northlandus.com) and Mike Zarba (mzarba@slrconsulting.com). Formal responses to all contractor RFI’s will be available to all bidders no later than three (3) business days prior to bids due. The deadline for submitting RFI’s to NLE and SLR will be July 10, 2023 by 2pm.
Bid Documents
NO. | NAME | TITLE |
---|---|---|
01 | TITLE SHEET | |
02 | PLN | OVERALL PLAN |
03 | IN | INDEX PLAN |
04 | PH | CONSTRUCTION SEQUENCING PLAN |
05-07 | EX-01 - EX-03 | EXISTING CONDITIONS |
08-10 | LA-01 - LA-03 | SITE PLAN - LAYOUT, LANDSCAPING & GRADING |
11-13 | SEC-01 - SEC-03 | SEDIMENT AND EROSION CONTROL PLAN |
14-16 | PRO-01 - PR-03 | ROADWAY PLAN AND PROFILE |
17-19 | UT-01 - UT-03 | UTILITY PLAN |
20-22 | W&S-01 - W&S-03 | WATER & SEWER PLAN |
23-24 | SD-01 - SD-02 | SEDIMENT AND EROSION CONTROL DETAISL AND SPECIFICATIONS |
25-35 | SD-03 - SD-13 | SITE DETAILS |
36-47 | XSC-01 - XSX-14 | ROADWAY CROSS SECTIONS |
Specifications:
- State of Maine Department of Transportation (MDOT) Standard Specifications
- Special Provisions including:
- Blasting
- Box Culvert
- Geomembrane Liner
- PWD Water and Sewer Specifications
- Retaining Wall
Supporting Documents:
- Soils and Natural Resource Surveys/Reports as follow:
- Class-B High Intensity Soil Survey (HISS) dated Feb. 9, 2021
- Wetland & Stream Delineation and Vernal Pool Survey Report dated June 16, 2020
- Maine DEP SLODA Permit #s L29846-39-A-N and L29846-TC-B-N
- ACOE NRPA and PBR Permit # NAE-2020-02456
- Gorham Planning Board Approval with Findings of Fact and Conditions of Approval for Subdivision - Gorham Industrial Park - West Campus
Projected Timeline
Construction Contract (EJCDC Document)
Contractor Proposal and Estimate
- Overhead and profit (fee) percentage to be charged.
- Lump sum general conditions amount.
- A full estimate schedule of values (see attached Bid Schedule and Special Provisions).
- An estimate of construction time (in days).
- The name and resume of the individual contractor proposes to use as Superintendent of Field Foreman for the entire duration of this project.
- The name and resume of the individual contractor proposes to use as Project Manager for the entire duration of this project.
Bonding
Each Bid must be made upon blank forms provided by the Municipality and must be accompanied by a bid bond of 5% of the bid amount or an official bank check, cashier’s check, certified check, certificate of deposit, or United States postal money order for 5% of the bid amount, payable to Town of Gorham, as a Bid Guaranty.
Performance and Payment Bonds for 100% of the contract value will be required. As part of your response, please confirm your bonding capacity for the project.
Based upon a review of all the above-mentioned information contractors will be selected for an interview with NLE and the Town.
Reservation of Rights
office, or agree to an offset which shall be established by the contract which shall be issued to the successful bidder.